Studio Renovation Update

As promised, here is the next installment featuring images from our studio renovation.   If you missed our last renovation update, feel free to catch up before continuing on! Remember, sessions, consultations, and the like are all being scheduled as usual.

This update shows the studio space, prepped with insulation (both in the walls and the ceiling).  The image below is looking into the sitting room (where sessions are photographed) from the office (behind-the-scenes work area).
This next image shows the opposite view.  From the sitting room, you can see the office (left) and the consultation room (right).
A closer look at the consultation room.

Now that the insulation is up, the next step of the renovation will be to hang drywall, get the drywall mudded and taped, and then for the finishing touches (lay the floor, apply trim, and put in the new stair treads/railing).  Keep posted for the next renovation update!

Your email is never published or shared. Required fields are marked *

*

*

There was an error submitting your comment. Please try again.

C o n n e c t